Case Evidence

Insert Molded Brass Nut Component

A threaded insert part needed pull-out strength without creating sink around bosses.

Buyer situation

The buyer had a plastic part that looked simple at first glance, but the tooling path required early review of geometry, material behavior, sample gates and production assumptions.

Main risk

A threaded insert part needed pull-out strength without creating sink around bosses.

Engineering decision

The project was reviewed through DFM notes, tooling assumptions and sample approval checkpoints before release.

Evidence

Insert retention, preheat handling and inspection points were defined before T1.

Project parameter snapshot

Case parameterExample evidence to capture
Part familyInsert molding
Starting input3D CAD, 2D drawing, sample photos or supplier issue notes.
Main riskA threaded insert part needed pull-out strength without creating sink around bosses.
Engineering decisionDFM notes, tooling route, material assumption, sample gate and release criteria.
Approval evidenceInsert retention, preheat handling and inspection points were defined before T1.
Commercial gateTooling deposit, T1 approval, correction agreement and production release should each have visible proof.

Evidence matrix

Evidence areaWhat the buyer should see
Starting filesCAD, drawing, sample photos or supplier issue notes that explain why the project needed review.
Mold decisionTooling route, steel/cavity assumptions, gate or parting-line decisions and expected correction risk.
Sample gateT1 sample photos, measurements, appearance notes, assembly fit and a clear issue list if correction is needed.
Release proofDimensional or FAI record, material confirmation, cosmetic approval and packing notes before repeat production.
Part familyInsert molding evidence should show the features that can fail: fit, seal, retention, cosmetic surface, load path or transparency.