FAQ

Injection molding quote and DFM questions.

Answers for buyers preparing custom plastic parts for tooling and production.

FAQ

Common buyer questions.

These answers help qualify whether the project is ready for MoldRoute or should go back to design work first.

Files

Can you quote without STEP files?

A rough first review can start from drawings or photos, but accurate tooling quotes need 3D CAD and clear assumptions.

MOQ

Do you support low-volume molding?

Yes, when real resin and process validation matter. Very small one-off needs may fit 3D printing or CNC better.

DFM

Is the first DFM review free?

A first fit review can identify obvious risk. Detailed redesign or engineering work is a paid project scope.

Quality

Can you provide FAI or CMM reports?

Yes, quality documentation can be planned by part risk, tolerance and buyer requirement.

Tooling

Do I own the injection mold?

Mold ownership should be clarified before deposit, including storage, maintenance, transfer conditions and what drawings or mold records are available.

T1 samples

What happens if first samples have issues?

T1 findings should become an issue list with likely cause, correction action, revised sample status and buyer approval before production release.

Materials

Can you help choose plastic material?

Yes, but the material recommendation depends on part function, appearance, heat, chemical exposure, strength, compliance and molding risk.

NDA

Can sensitive CAD files wait until NDA?

A first fit review can start from limited context. Detailed CAD, drawings or supplier files can wait until the buyer confirms fit and NDA terms.

Commercial FAQ

Price comparison only works when assumptions match.

Before comparing suppliers, the buyer should confirm the business terms that affect tooling risk, T1 correction and repeat production.

Commercial questionWhat MoldRoute should clarify before quote approval
Typical MOQPilot and bridge projects can start lower when the tooling route fits; repeat production should define first order and annual demand separately.
Lead timeThe quote should separate DFM clarification, mold build, T1 sampling, correction loop and production release instead of giving one vague date.
Mold ownershipConfirm whether the mold is buyer-owned, where it is stored, what maintenance is included and what happens if transfer is requested.
NDA and file sharingA first fit review can start from limited context; detailed CAD, drawings and supplier files can wait until NDA terms are agreed.
Payment gatesTooling deposit, T1 approval, correction responsibility and production payment should be tied to clear evidence gates.
Export packingApproved molded parts may need packing notes, labels, carton protection and handoff to packaging execution.
Before sending a request

FAQ answers should lead to clearer quote inputs.

The FAQ page is also a qualification page. It gives buyers a simple way to decide which information is worth preparing before they upload CAD or ask for a mold estimate. It also answers common questions around file readiness, MOQ, tooling ownership, T1 sample problems, material selection and quality evidence, reducing back-and-forth before the first engineering reply.

If the buyer is askingInformation to prepare
Can you quote this part?Send file status, part type, material target, estimated quantity and the decision you need from the first reply.
Can you make the mold?Add expected mold ownership, production volume, sample approval rules and whether the mold may need transfer later.
Can you fix supplier issues?Attach photos, current defect notes, inspection reports, sample feedback and what has already been tried.
Can you choose the material?Describe strength, heat, chemical exposure, appearance, flexibility, compliance and any resin already tested.
Upload CADContact