Case Evidence

Packaging Cap Low-Volume to Production

A cap project needed bridge quantities before committing to a multi-cavity production mold.

Buyer situation

The buyer had a plastic part that looked simple at first glance, but the tooling path required early review of geometry, material behavior, sample gates and production assumptions.

Main risk

A cap project needed bridge quantities before committing to a multi-cavity production mold.

Engineering decision

The project was reviewed through DFM notes, tooling assumptions and sample approval checkpoints before release.

Evidence

Rapid tooling validated closure fit before the production mold path was locked.

Project parameter snapshot

Case parameterExample evidence to capture
Part familyCap and closure
Starting input3D CAD, 2D drawing, sample photos or supplier issue notes.
Main riskA cap project needed bridge quantities before committing to a multi-cavity production mold.
Engineering decisionDFM notes, tooling route, material assumption, sample gate and release criteria.
Approval evidenceRapid tooling validated closure fit before the production mold path was locked.
Commercial gateTooling deposit, T1 approval, correction agreement and production release should each have visible proof.

Evidence matrix

Evidence areaWhat the buyer should see
Starting filesCAD, drawing, sample photos or supplier issue notes that explain why the project needed review.
Mold decisionTooling route, steel/cavity assumptions, gate or parting-line decisions and expected correction risk.
Sample gateT1 sample photos, measurements, appearance notes, assembly fit and a clear issue list if correction is needed.
Release proofDimensional or FAI record, material confirmation, cosmetic approval and packing notes before repeat production.
Part familyCap and closure evidence should show the features that can fail: fit, seal, retention, cosmetic surface, load path or transparency.

Prepare a similar request

3D CAD or 2D drawingTarget resin and finishEstimated quantityCritical dimensions or cosmetic zonesPhotos of current samples if availableCurrent supplier quote or T1 issue list if the project is already active